12/21/18 1.3 Hours Finished installing left master brake cylinder. Marked brake lines leading to parking brake. Planing coolant hoses length and routing.
12/22/18 Received battery and charger from EarthX and wire and parts from ASS. 2.4 Hours Marked firewall area to keep clear for battery access. Labeled, cut to length, added terminals for oil temperature lead and the fuel pump. Drilled holes in upper forward skin L angles for wire holders.
12/23/18 21 Hours Attached padded clamps to upper forward skin L angles.Located spot for ground block on cabin side of firewall. Drilled mounting holes and deburred. Drilled out two rivets (one each side) in channel for fuel line clamps.