KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  12-10-2018
Number of Hours:  6.60
Manual Reference:  
Brief Description:  Electrical & Brakes

12/8/18
3.2 Hours
Drilled mounting holes in center console for power outlet. Temp mounted flap motor. Drilled holes in cabin cross members for flap and trim wiring routing. Deburred. Added grommets and ran wire. Tie wraped. Removed left throttle cable and trimmed cable sleeve to give better relief to cable. Added fire sleeve to engine main fuel line.

12/9/18
1.3 Hours
Removed right throttle cable and trimmed cable sleeve to give better releif to cable. Enlarged hole in front seat channel cross member. Added grommet. Routed trim/flap wires forward. Wire tied.

121018
Received ground terminal block and shieled 18 AWG from ASS.
2.1 Hours
Brake lines attached to master cylinders and calipers. Parking brake to go. Tested electrical fuction of flap motor, full range twice. Assembled ground terminal block. Attached flaperon motor to mixer.
' style=

Trim & flap wiring

Trim & flap wiring

' style=

Shortened throttle sleeve

Shortened throttle sleeve

' style=

Flap motor test

Flap motor test

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.