KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  12-4-2018
Number of Hours:  3.90
Manual Reference:  
Brief Description:  Electrical

12/2/18
.3 Hours
Looked at the installation of the flap motor, wire routing and hardware needed.

12/3/18
Receiver switchs and breakers from ASS
1.7 Hours
Measured the mag switchs and circuit breakers for correct drill size. Drilled the two breaker holes and two mag switchs in instrument panels. Deburred. Measured for shieled mag wires.

12/4/18
1.9 Hours
Drilled 5/16' hole in baggage area cross member for flaparon motor wire. Deburred and inserted grommet. Took awhile, but got the engine electrical plugs apart in prep for mag kill wire. The plugs come apart fairly easily once you figure out the secrets of the release tabs. Packed up electrical tools and parts in order to make wiring leads at home. Ordered 18AWG shielded wire for mag kill leads.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.