Brief Description: Pitot/static system, middle windows
4/11/20 2.0 Hours Had to enlarge hole in wing that the pitot/static probe goes into. Lots of twisting and shoveing so after I got it in place, thought I would run the airspeed test again. It failed. Again, it turned out to be the test equipment hook-up. Got it down to 1 kt loss in 1 minute. Now if I can just hold that thought.
4/12/20 No work. Cold and snow
4/13/20 2.5 Hours Entered design V speeds into Dynon. Checked airspeed system again (OK). Installed cowling to see if I could do it by myself. I can but it sure would be easier with help. Mounted prop spinner.
4/14/20 1.2 Hours Up drilled to 1/8" predrilled holes in middle side windows and deburred. Clecoed into place. They will need some sanding on forward edges to fit correctly.