KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  7-21-2019
Number of Hours:  10.40
Manual Reference:  
Brief Description:  Stabilizer, vertical fin

7/19/19
Received bolts from ASS and rear fuselage/fin plates from Zenith
4.0 Hours
Drilled pilot holes fin L angle iand then a couble nto stabilizer top skin and clecoed. Tried fin in place for fit. Looks OK. Marked location of L angle onto inside of fin skin. Removed fin and transfered angle location to outside of skin. Drilled pilot holes in skin for L angle attachment.
Replaced AN5 bolts in pulley assemblies. Riveted lower pulley into place. Put fin back on acft.

7/20/19
2.0 Hours
Back drilled through fin skin pilot holes in stab L angle and clecoed as I went. Started on fin nose piece. Used a piece of long L angle on leading edge of fin to project where nose piece would meet top of fuselage. CuFt-outs for leading edge of stab have to enlarged a fair amount. Started trimming.

7/21/19
4.4Hours
Fin nose piece on and off a bunch of tiimes. Fileing. Final fitting with Norma holding the very springy nose piece in place. Got a good fit and back drilled a few holes through the nose piece into fin and clecoed
' style=

L angles inside

L angles inside

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.