3/14/20 2.0 Hours Finished connecting the right wing fuel line and connected the left wing fuel line. Riveted the two ruddder stops with eight AS5 rivets.
3/15/20 3.3 Hours Worked on Paul's FWF ten item punch list. Got four cleared. Zip tied several other wires, Re-routed the oil lines to give better clearance from engine mount.. Pluged together several wires that were just hanging. Had Paul stop by to explain a couple of items on the list and look at the wing fuel lines.
3/16/20 2.2 Hours Cleared four more plunch list items. The two remaining have to due to applying silicone to the exhaust springs and a wire hold down. Applied anti-sieze goop to wing fuel filler fittings and secured. Added 1/2 gal of fuel to each tank for leak check. Not enough. Added another 1/2 gal to left tank. Found that the quick drain on left tank wouldn't. Talked to local A&P about it and he gave me a couple of ideas to check.