3/7/20 2.0 Hours Used burrr in Dremel and sharp chisel to trim the nose wheel bottom bearing block to get the 20 deg rudder deflection. Received 200 A4 rivets from Zenith.
3/8/20 1.0 Hour Finished riveting the left wing tip.
3/9/20 2.3 Hours Had Paul over to look over the FWF. He made a list and pointed out areas that I have to work on. Moved top cowl to workbench to insert camlocs Started on the right wing fuell line.
3/10/20 2.5 Hours There must be a trick to it but it took Norma and I nearly the whole time to put the retainers rings onto the ten 4002 Camlocs of the top cowl. Made bumpers out of foam swimming pool noodles to protect the wings from running into hangar walls.