2/2/20 1.7 Hours Screwed the windshield into place using 24 #8 washer head scsrews (7 each side, 10 across top).
2/3 thru 5/20 Cold ( Hi10F), snow days.
2/6/20 2.0 Hours Sanded joint of two piece wing tips. Completed installing door front weather strip (both)
2/7/20 2.2 Hours Fabricated a up elevator stop for the 28 deg up elevator. Fooled around with the 8" Zenith Aircraft stickers from Aircrafstickers.com that I plan to put on the tail. Sanded some more on the wingtips (one of thoes chores that I can't do in long stretches)