KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  1-1-2020
Number of Hours:  3.80
Manual Reference:  
Brief Description:  Cowling and exhaust

12/30/19 Too cold to work (18F). Received more camloc stuff from PegAsus.

12/31/19 Received nuts, bolts and clamps from ASS.
1.3 Hours
Riveted the remaining camloc receptacles. Reinstalled cowling and started to determine the correcct studs to use.

1/1/20
2.5 Hours. Happy New Year.
Finished determineing the camloc stud length. Removed cowling. Install adel clamps to hold coolant hose from exhause pipe. Trimmed corner of 2 inch exhause shield to protect coolant hose at the top of the radiator.
' style=

Coolant hose clamped in place

Coolant hose clamped in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.