KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  11-28-2019
Number of Hours:  1.70
Manual Reference:  
Brief Description:  Top cowl camlocs

11/25/19
.2 Hour
Borrowed a #6 camloc stud from Paul to try in cowling. That's the one. Too cold to work. UPS delivery from ASS delayed because of road closure (snow).

11/26 &27/19
Too cold to work. A -8F at airport this morning
Received two -5s and two -6s camloc studs and two pieces of 1/4" 4130 tube from ASS. Ordered twelve -6 camloc studs from ASS.

11/28/19 Thanksgiving
1.5 Hours
Put the two -6 camloc studs in the cowling. Cut a bushing from the 1/4" X .028 for the oversize hole in the right IB flaperon IB stub. Used the Threadlock and inserted into the stub. Put the combined cowl onto aircraft.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.