11/25/19 .2 Hour Borrowed a #6 camloc stud from Paul to try in cowling. That's the one. Too cold to work. UPS delivery from ASS delayed because of road closure (snow).
11/26 &27/19 Too cold to work. A -8F at airport this morning Received two -5s and two -6s camloc studs and two pieces of 1/4" 4130 tube from ASS. Ordered twelve -6 camloc studs from ASS.
11/28/19 Thanksgiving 1.5 Hours Put the two -6 camloc studs in the cowling. Cut a bushing from the 1/4" X .028 for the oversize hole in the right IB flaperon IB stub. Used the Threadlock and inserted into the stub. Put the combined cowl onto aircraft.