10/3/19 1.5 Hours Marked spot on trailing edge. Drilled stop hole then drew line from front of trailing edge to stop hole. Trimed inboard edge of trailing edge.
10/4/19 2.5 Hours Flushed the fuel system from wing root to gascolator using 91 clear gas. Used compressed air to blow out execess fuel. A few small specks of rubber in catch filter. Dressed the ends of trailing edge. Preped area to attach wings.