KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  9-11-2019
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Baggage area, fuel tanks

9/9/19
2.7 Hours
With new batch of A4 rivets received from Zenit h over weekend, finished riveting in baggage back panels both sides. Shortened tip of 3/8" plug for righ tuel tank return fuel port and installed with sealant. Riveted ground wire to fuel tank ground tab. Got all the screws for the fuel sender started.

9/10/19
3.8 Hours
Shortend tip of 3/8" plug for left fuel tank return fuel port and installed with sealant. Installed quick drain. Tightened screws for right tank sender with sealant after using using inspection camera to check alignment of float. Set tank on inboard end and added some gas for leak check of sender, quick drain and screen outlet. Added terminal to right sender wire.

9/11/19
2.5 Hours
Flushed left tank with gas. Right tank did not leak with the small amount of fuel. Will add more. Had to drill out the six rivets holding the door strike plates to place on oppisite door.
' style=

Left baggage back

Left baggage back

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.