KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  9-5-2019
Number of Hours:  6.30
Manual Reference:  
Brief Description:  Baggage area, Dynon, fuel tanks

9/2/19
3.3 Hours
Made the short, 2" L angle that connects the leading edge of control tunnel top to the right control tunnel side, Drilled and clecoed. Clecoed the left bggge upright into place. Never ceases to amaze me that by clecoing in different order,you can get the holes to lineup. Like the holes move or something.

9/3/19
1.5 Hours
Screwed in Dynon radio and intercom heads with #6 socket head screws. Trial fit right fuel tank into wing. Installed quick drain and screen outlet with thread sealent.

9/5/19
1.5 Hours
Rinsed out right fuel tank with 91 oct clear gas. Aired out. Got parts together Determined that I had not put thread sealant on return fuel inlet plug. Installed grommet for fuel level wire into right wing spar,
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.