Jay's Cruzer
' style=
Date:  9-1-2019
Number of Hours:  10.70
Manual Reference:  
Brief Description:  Baggage floor, misc

8/30/19
3.2 Hours
Riveted left side baggage floor into place. Glued windshield spacers together.

8/31/19
4.2 Hours
Attached things to inside firewall. ADS-B screwed. Heat vent riveted. Engine monitor screwed with stand-off spacers. Rearranged some wires.

9/1/19
3.3 Hours
Norma spent the entire time cleaning the bottom of the fuselage. Added cotter pin to lower elevator attachment. I added washers and cotter pins to nose wheel steeering rods on rudder pedals. Riveted in right side throttle pass through on firewall. Will redo. Cut a slot instead of a slit in fireproof material. Riveted right side back baqggage piece into place. Ran out of A4 rivets.
' style=

Left baggage floor

Left baggage floor

' style=