7/23/19 4.3 Hours Evened the fin nose piece left and right. Marked outside of fin nose on top of aft fuselage. Marked fin L angles for cuts for bending. Drilled releif holes in corner of L angles and used snips to cut a wedge from the short leg of the angles. Marked and then drilled pilot holes for mounting right L angle onto fuselage,
7/25/19 4.5 Hours Worked on left L angle for the fin nose mounting. Disassembled and removed fin and stab. Norma Cortec all L angles and inside of fin skins. Reattached L angles on top of fuselage and up drilled to A4. Removed and deburred then reattched.
7/26/19 5.5 Hours Replaced one rivet that was seated correctly. Remouunted stabilizer. Checked alignment then torqued bolts to 23 in/lbs. Put elevator into place and connected cables. Alot of slack.