KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  6-29-2019
Number of Hours:  7.30
Manual Reference:  
Brief Description:  Service Bulletin October 11 2018

6/28/19
4.0 Hours
Make backing plates for the two fuel line elbows at the fuselage wing root and installed them.
Continued with the Service Bulletin October 11 2018 work back drilling through the new 8 ft elevator hinge,

6/29/19
3.3 Hours
Continued with Service bulletin. Finished eleavator hinge. Moved stab to table and removed the 69 rivets and hinge. Marked the rivets that have to be removed for the skin doubler. Brought the elevator to stab and test mated the hinge. Have to think of a way to remove hinge pin if need be.
' style=

Fuel elbow

Fuel elbow

' style=

Hinge removed

Hinge removed

' style=

Elevator-stab test fitted

Elevator-stab test fitted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.