6/25/19 3.7 Hours Completed plug for root of right wing. Prepared wires at wing tips for connection to strob/nav lights. Connected intercomm to power and ground. Right side audio now works.
6/26/19 2.6 Hours Had to fish the trim cable that was coied up and taped to the floor in front of the most foreward aft bulkhead. Zip-tied a piece of spirial wrap to cable. Preped cable end and added a six pin plug (only 5 pins used). Will tackle stab/elevator service bulletin next, looks like about 130 rivets have to be removed (@!#*!) for the hinge alone.
6/27/19 4.1 Hours Tried the new fulel elbows received from ASS. Will have to make some washers for them. Conected the cabin heat push/pull cable to the heat butterfly valve in the firewall. Moved a bunch of stuff off the table. Moved the elevator to table. Drilled the 66 rivets in prep for Service Bulletin October 11, 2018's new 8 ft hinge install,