6/22/19 4.5 Hours Refined access door opening for right wing. Riveted A3 and A5 rivets. Have to wait for A4s to arrive. Prepared four sets of wing wires (each set has 3 wires plus shield) for plug connectors. Cut pitot/static shorter to get execess out of way.
6/23/19 2.7 Hhours Made the plug connections for the two fuselage wing roots (nav, strobe and fuel level).
6/24/19 Received A4 & A5 rivets from Zenith 3.0 Hours Riveted in the two trailing edge access doors. Completed left wing plug. Enlarged hole in spasr for the fuel level leads.