Brief Description: Battery cables, wires, comm antenna
6/7/19 2.7 Hours Completed the remainder of #4 battery cables with crimper borrowed from Soaring Aviation. Changed the ADS-B to serial port #1 and system found it. Still looking for transponder.
6/8/19 4.5 Hoursr Updated Dynon software to 15.4.7 and data base. Continued trouble shooting transponder pbroblem. The cable between the transponder and the network hub is mis-wired. Pins 5 and 7 at the transponder are suppose to go to pins 2 and 3 at the hub end. Pin 5 is wired to pin 16. Pin 2 is open. Connected power wires for 12V power out plug the the USB power plug. Ran the initial SV-320-Bat test. It passed. Sent e-mail to Approach Fast Stack ref transponder cable.
6/9/19 4.2 Hours Installed comm antenna. Added strain relief to antenna lead. Added terminals to mag shield leads and secured to ground point. Zip tied alot of wires. Ran out. Tightened screws here and there.