5/23/19 3.0 Hours Installed a corner #8 nut plate on center console bracket. Ran mic/phone wires through console. Supported them with padded clamp. Ran PPT wires to each control stick location.
5/24/19 3.5 Hours Installed Dynon USB cable to center console with #4 screws. Installed control sticks to elevator torque tube. Installed flaperon rods to control slicks. The controls lock because elevator control horn gets trapped between the bolts and rod ends. Paul and I discuss. Move arms to aft side of flapron tourque tube horn.
5/25/19 4.5 Hours Added a support for intercom cable below the upper forward skin (glareshield). Screwed fuel hose padded clamp on right side into place. Eleavator push/pull rod scraping opening. Hard to get to hole to enlarge. Many off and on's.