5/11/19 Received aluminum rivets from ZAC and parts from ASS 3.9 Hours Riveted map box onto instrument bulkhead. Screwed instrument panel onto bulkhead. Norma cleaned anti-corosin off roof and cleaned guessets on doors. Removed clecoes of glareshield and started pattern for glareshield fabric. Windshield on and off several times to figure out pattern.
5/12/19 5.0 Hours Finished riveting bubble to right door. Finished pattern for glare shield fabric and removed. Found that I have to get a bigger piece of fabric. Installed grommet and ran wire for ELT remote. Tie-wraped to other wires. Dressed the opening in instrument panel for map box Drilled hole for ELT antenna cable in baggage area. Installed latch on map box door.
5/13/19 2.8 Hours Riveted comm antenna cable/pitot/static/ADARS cable bracket into place. Cut and drilled L channels for flaperon cover support.