KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  5-7-2019
Number of Hours:  11.80
Manual Reference:  C75-NA-1
Brief Description:  Right door

5/5/19
5.3 Hours
Drilled the six holes (three each) in the two right door strike plates. Deburred, bent and riveted.

5/6/19
2.4 Hours
Up drilled to #20 left door hinge to match factory drilled right door. Removed winrdshield. Installed foreward latch on right door with Locktite.

5/7/19
4.1 Hours
Riveted right door bubble with all rivets remaining (ordered 25 more from Zenith along 190 1/8" rivets for side and top windows.) Short, 5 ft antenna lead of ELT limites where it can go. Decided on location same area as flap motor except on left side. Made a backing plate for ELT mount,
' style=

Right strike plates

Right strike plates

' style=

ELT back plate in progress

ELT back plate in progress

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.