KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  2-14-2019
Number of Hours:  7.40
Manual Reference:  
Brief Description:  Fuel line and wiring

2/12/19
3.3 Hours
Labeled strobe sync wire, added terminals and shrink tubing to ends. Cut static and pitot tubes shorter mainly to get them out of the way. Cut fuel tines in bagage area to length and attached tee with hose clamps. Chris Macatee, A&P and EAA Tech Advisor, stopped by. Discussed a few wiring and lluel items. He pointed out where I needed to add some standoffs to a couple of sensor wires on the engine. I did that after he left.

2/13/19
2.0 Hours
Drilled pilot holes 100 mm from exhaust flange, per Rotax instalation manual, for for EGT probes. Shortened EGT wires from EMS and added terminals.

2/14/19
2.1 Hours
Updrilled to 9/64" #s 3 & 4 exhaust for EGT probes. Installed probes. Identified wire from EMS harness for Tach and attached terminals. Preped wires for fuel flow sensor.
' style=

Left wing root

Left wing root

' style=

Baggage fuel tee

Baggage fuel tee

' style=

# 4 EGT

# 4 EGT

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.