2/2/19 3.2 Hours Drilled second hole through firewall below shunt and another in cross member for fuel pump, flow, fuel pressure, oil temp and coolant sensor wires. Deburred aod added grommets. Labeled EGT wires.
2/3/19 2.1 Hours More EMS wiring. Rerouted oil and coolant sensor wires to new location near fuel pump. Did a survey of GPS wire routing. Looks like down the flapron rod cover channel on aircraft right (like the pitot/static on the left).
2/4/19 Received stabilizer/elevator Service Bulliten parts from Zenith via UPS. 2.5 Hours Located spot on right side of fuselage roof just ahead of flaparon slot. Drilled center wires hole. Put GPS receiver on roof, squared up placement then back drilled throught mounting holes, inserting #8 screws as I went to hold receiver in place. Deburred all. Drilled hole for wires in flaparon channel cover. Deburred and added grommet.