KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  2-4-2019
Number of Hours:  7.80
Manual Reference:  
Brief Description:  Electrical

2/2/19
3.2 Hours
Drilled second hole through firewall below shunt and another in cross member for fuel pump, flow, fuel pressure, oil temp and coolant sensor wires. Deburred aod added grommets. Labeled EGT wires.

2/3/19
2.1 Hours
More EMS wiring. Rerouted oil and coolant sensor wires to new location near fuel pump. Did a survey of GPS wire routing. Looks like down the flapron rod cover channel on aircraft right (like the pitot/static on the left).

2/4/19
Received stabilizer/elevator Service Bulliten parts from Zenith via UPS.
2.5 Hours
Located spot on right side of fuselage roof just ahead of flaparon slot. Drilled center wires hole. Put GPS receiver on roof, squared up placement then back drilled throught mounting holes, inserting #8 screws as I went to hold receiver in place. Deburred all. Drilled hole for wires in flaparon channel cover. Deburred and added grommet.
' style=





' style=

GPS above baggage area

GPS above baggage area

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.