KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  1-7-2019
Number of Hours:  6.00
Manual Reference:  Dynon Guide
Brief Description:  Hub Box, engine, avionics

1/5/19
3.2 Hours
Paul stopped by after EAA chapter meeting and to show me how to safety wire the throttle/choke cables. Talked about placement of other items. Drilled holes for placement of hub box on on inside of firewall and riveted mounting plate using #4s. Started to run cable to ADAHRS but found the cable was miss make. Reinstalled instrument bulkhead panel so I could figure out cable routing.

1/6/19
2.2 Hours
Did some thinking andi measuring to see where transponder and engine monitoring systems will go.
Finished the last two choke/throttle safety wiring. Put washers and nuts on the AN4 bolts on the engine mount. That should have been done before the plumbing. Hard to get to with all the hoses.

1/7/19
Will exchange miss make ADAHRS cable with Approach Stack.
.6 Hour
Drilled out three rivets to remove bracket on inside of firewall that was "a good idea" at the time to make room for transponder. Did some more dressing of instrument panel bulkhead.
' style=





' style=

Throttle/choke safety wired

Throttle/choke safety wired

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.