Brief Description: Throttle patch, fuel system ,brakes
12/17/18 Ordered kit from Zenith for the "Stabilzer Service Bulletin" dated 10/11/18. 2.3 Hours Cut, drilled and deburred patch for the right hand firewall throttle slot. Deburred inside right side pre-drilled holes in firewall flange. Located place for nut plates for center console mounting.
12/18/18 2.1 Hours Deburred inside left side pre-drilled holes in firewall flange. After reading Zenith "Service Letter/Notification" subject: Fuel System, dated Feb 2018, I decided to change my plan. Cut fuel line from gascolator tp baggage area to be able to add "T" then run lines up each side to wings. Removed cover from channel to see about adding clamp to minimize line movement in channel.
12/20/18 3.8 Hours Started to install brake master cylinders. Just bolt them in, right? The bolt holes in mount were not aligned and had to re-drill them. The distance from the bolt hole to the edge of mount was too great. Hand to file, and smooth edges of mounts to get the bottom of master cylinders from jamming on mount edge. 2 1/2 hours for right brake. Still working on left.