KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  11-20-2018
Number of Hours:  6.30
Manual Reference:  
Brief Description:  Throttle, choke and electrical

11/19/18
2.3 Hours
Finished the two chokes. Just enough cable sheath. Removed the two penny washers on the right side engine mount and filed down edges on about a third of circumference to give more clearance to hoses. Returned washers to their place. Marked location for flap switch on mockup inst panel.

11/20/18
4.0 Hours
Tried to figure out where to put the alternator recifier. The lead from the alternator is too short to mount on firewall. Paul stopped by and sugested on the engine mount. Spent some time making a bracket then decided to use padded 3/4" clamps. Temp mounted. Drilled a couple of holes to mount the starter selenoid on bottom right side of firewall cross member next to center. It is just above the battery and right behind the starter. Temp mounted.
' style=

Choke cables

Choke cables

' style=

Rectifier on mount

Rectifier on mount

' style=

Starter selenoid

Starter selenoid

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.