KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  11-10-2018
Number of Hours:  5.40
Manual Reference:  
Brief Description:  Misc Engine & Brake

11/9/18
1.9 Hours
Put 1/2" foam water pipe insulation on engine mount tubes to protect the paint then tried to put muffler in place. Can't do it with cabin heat shroud on mluffler. A real snake job. Made sure oil lines were well clear of exhaust tubes. Looks like the left upper (left rear clylinder) flange fitting on mluffler is not round. Will have to figure a way to make it mesh with tube from left rear cylindar. Big hammer? Up drilled holes in radiator mounting bracket to accept anti-vibration fittings.


11/10/18
3.5 Hours
Added the 45 deg replacement AeroQuip fitting to oil line that conects to oil pump. Another workout. Rested. Trial fit brake cable to parking brake valve to verfly operation. Works good.
Drilled 3/8" holes in center console for brake and cabin heat control cables. Installed 45 deg fitting to top of electric fuel pump. Final bolted pump to firewall. Had Paul look at not round exhaust conection on muffler. He had a couple of suggestions to correct. After looking at all four coupleings, the other three are machine finished and polished. The fourth is not.
' style=

Holes drilled for brake & cabin heat

Holes drilled for brake & cabin heat

' style=

Parking  brake trail

Parking brake trail

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.