KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  11-2-2018
Number of Hours:  4.90
Manual Reference:  
Brief Description:  Oil line fittings

11/1/18
Stopped by a hose facility to ask about oil line fitting assembly. One additional item. Heat the sucker.
2.4 Hours
Cut off the hose from the partial assembled one to start over. Mounted fitting in vise. Warmed (warm not hot) the fitting and hose. Inserted needle nose pliers into hose and twisted. Applied petroleum jelly, AKA Vaseline, to fitting and inside hose. Put hose on fitting and pushed down and twisted like crazy. It worked. A real cardovascular workout. Repeated four more times after cutting hose to length. Have to wait until engin in place to get the length of line from cooler to oil pump.

11/2/18
2.5 Hours
Temperrally mounted engine onto aircraft. Had to reverse location of oil lines from oil cooler. Looks like will have to move banjo fitting on engine bottom to the front outlet. Just not enough room to attach oil line at rear location.
' style=

Oil lines to top of cooler

Oil lines to top of cooler

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.