KitLog pro

Powered By Kitlog Pro v2.0

Kenneths Web Site
' style=
Date:  9-23-2005
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Working on the stabelizer.

Match drilling the horazontal stabelizer to the airframe.
' style=

Here you can see wher I drilled the front of the stabelizer to the rear deck lid.

Here you can see wher I drilled the front of the stabelizer to the rear deck lid.

' style=

Here iI drilled the back half of the stabelizer to the vertical stifners.

Here iI drilled the back half of the stabelizer to the vertical stifners.

' style=

Here you can see everything bolted up.

Here you can see everything bolted up.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.