Powered By Kitlog Pro v2.0
Kenneths Web Site
RV9A
Fuselage
3-20-2005
< Previous Log Entry
Next Log Entry >
Date:
3-20-2005
Number of Hours:
2.00
Manual Reference:
Brief Description:
Match drilling rear fuselage.
Finished match drilling the rear fuselage, I then tore it down to start on the deburing and dimpling.
View of the rear fuselage with one side removed.
View with all sides removed.
View of nothing but the parts lying in a pile.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
470
1537
Aileron left
4
16
Aileron right
5
15
Ailerons both
1
4
Avionics
2
3
Baffeling
15
72
Canopy
1
2
Canopy
8
16
Cowling
7
22
Electrial
1
1
Empennage
2
8
Engine
14
42
Engine 0-320
14
42
Exhaust
1
2
Flaps left
4
27
Flaps right
7
34
Fuel Line
1
2
Fuel tank left
8
24
Fuel tank right
13
40
Fuel Tanks
9
18
Fuselage
160
504
Inspection
1
2
Instrument panel
22
68
Instrument panel
7
22
Interior
3
18
Jigs
4
10
Leading edge light.
4
7
Lighting.
1
0
Oil Cooler
2
7
Pitot tube
3
7
Prop
1
3
Rear spar both
1
5
Rear spar left
1
4
Rear spar right
3
10
Rudder
2
4
Shop Cleaning
5
35
Spinner
2
9
Tools
3
6
Vertical stabelizer
6
18
Wign spar left
1
2
Windshield
18
54
Wing left
29
83
Wing ribs
2
7
Wing right
21
82
Wing spar right
1
2
Wings
4
8
Wingtip both
15
72
Wingtip left
1
2
Wingtip right
4
10
Wireing
13
43
Wiring
13
43
Copyright © 2001-2024 Matronics. All Rights Reserved.