KitLog pro

Powered By Kitlog Pro v2.0

Kenneths Web Site
' style=
Date:  3-19-2005
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Match drilling holes to the J channels.

After assembling the rear of the fuselage with the J channels trimmed to fit, I drilled all the matching holes with the four J channels in line.
' style=

I firsdt leveled the fuselage a dropped a plumb bob for square.

I firsdt leveled the fuselage a dropped a plumb bob for square.

' style=

Here I am drilling into the J channel through the matched holes.

Here I am drilling into the J channel through the matched holes.

' style=

I am kind of admireing what has been done.

I am kind of admireing what has been done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.