KitLog pro

Powered By Kitlog Pro v2.0

FERRIS'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-29-2007
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Closed horizontal stabilizer & prepare fuselage br

Pressure tested the wings using a 1psi pressure provide by bicycle hand pump. All was good and no leaks.
Similarly to the wing the horizontal stabilizer was closed and weight added using sanbags.
Back to avionics shop to design and select the equipment that would suit the budget.
' style=

Horizontal stbilizer after bonding

Horizontal stbilizer after bonding

' style=

Horizontal stbilizer

Horizontal stbilizer

' style=

Sand/prepare fibreglass components

Sand/prepare fibreglass components

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.