KitLog pro

Powered By Kitlog Pro v2.0

FERRIS'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-28-2007
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Arrive Redmond, start inventory and sand wings

First day at Lancair for the initial builder assist/training program.
Spend the day sorting the hardware components and sanded the wings to prepare them for closing.
Sanded the open bottom wing spars and other contact areas for bonding. No shiny surfaces are allowed.
Attached and tightened fuel vents/check valves prior to closing top skin of wings. Later the mini NACA scoop will be cut thus allowing the venting and the pressure build up to occur.
Wing were closed using a mix of HYSOL/FLOX at the right consistency then applied with trowel on the acetone cleaned up surfaces
Initial consultation with avionics shop.
' style=

Kit Components

Kit Components

' style=

Sanding wings prior bonding

Sanding wings prior bonding

' style=

Pulling Nav antenna/light draw wire

Pulling Nav antenna/light draw wire

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.