KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  4-24-2014
Number of Hours:  5.00
Manual Reference:  
Brief Description:  FAB retainer clips-2 and Alt air bypass inlet-1

Cut down to a more sensable size the 6 clips I bent and cut yesterday.
Debured and rounded the edges of clips
clamped in position over each mount hole and matche drilled the 3/16 hole in each and cleco
Drilled the two rivit holes for the plate nuts in each clip
Test fit the air filter then set aside for some sanding and then riviting later

Decided to start the alternate air inlet and door
Fit the top plate with filter in position in the air box and positioned the inlet flange and traced cut out
Cut the opening roughly using asorted cutting implements available
Smoothed the hole out via sanding and then slowly worked the opening up to 2 11/16"
Study plans to figure out door operation and orientation on air box
Laying under the carb with the airnbox and door assenbly, position towards my cable from firewall
Marked flange orientation on to the airbox
Match drilled the mounting holes from flange to the air box
Countersink all 5 #30 drill holes and the two #40 plate nut rivit holes
Bent the tab that holds door closed as depicted with a 1/16 bend radius
Cut a 1/4inch stop tab and bent as well
Had to trim the door so it would rotate without hitting the stop tab untill closed
PPlans say to use tank sealant to make a gasket. I used fire barrier 2000 plus instead
CClecoed the flange with sealant in place and then rivited with rivits
All thats left is securing the door and cable to the flange and airbox.
' style=

6 filter retainer clips were drilled in place

6 filter retainer clips were drilled in place

' style=

Alternate air inlet flange installed in bottom of airbox

Alternate air inlet flange installed in bottom of airbox

' style=

Alternate air inlet with the door positioned

Alternate air inlet with the door positioned

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.