KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  12-7-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Rivit on baffle seals on 3 sides

I rivited on the baffle gap seals to the back baffle and the left and right sides. I over lap the seperate pieces as necessary to allow easier removal of the baffles if it becomes necessay in the future. These overlaps are also situated so that incoming air wont lift at the overlap. I will probably need to apply some rtv along the upper edge of the baffle as well as between the pieces that overlap. The bafles around the ring gear will still need templates made and baffle seal material cut.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.