Bill & Brendas RV-8 QB
' style=
Date:  1-23-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  lower cowl final fit preps for DAR inspection

Removed the lower cowl
Checked inside left wall for any sign of rubbing or interference with fab. None noticed
Block sanded a little along the vertical edges to the firewall for better gap
Worked on bottom piano hinge pin fit some more. Got to fit and lock in place
Reinstalled the air inlet gap seals
Reinstalled the bottom cowl after doing another check of all engine nuts and bolts tight

Note: The DAR that I plan to have do the AW inspection wants the cowl installed for his initial checks. So hopefully the bottom is on to stay at least until the inspection.