KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-3-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Engine arrival and unpacking

The Fed ex truck arrived at my hangar today with my lycoming o-360 engine. No call to let me know it was on the way or estimated delivery time so I was just lucky that I was off today and at the hangar. Whew!!!
With help from 4 other people, I was able to lift the 340 pound box out of the truck and rest on my solid EAA work bench with rollers on the legs and then roll it deep into the hangar. I dont have a hoist so Im leaviing it benched for now.
The engine is shipped preserved for storage and so it is in a vaccume sealed bag with desicants and plugs and preservative oil etc. I dont want to break open the bag too early but yet I ned to get it on my engine stand.
Hmmmm. what to do?
After opening the box, I pulled out the box containning the warranty material as well as the installation and operation binder. Also the carburator was in its own box too.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.