KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  4-6-2013
Number of Hours:  2.25
Manual Reference:  OP-10/11
Brief Description:  Fab CB buss bar and wire routing prep plus misc

1. Cut a strip of uhmw tape to line the inside wall of the CB console as extra precaution. Also applied some to the battery hold down bar for same reason

2. Fabricated the copper buss bar for the three CBs in the console that will accomodate the taller 60 amp CB. I then drilled the required holes and mounted. Added the 8 AWG jumper to tie the two buss bars together per drawing 10

3.Completely went through dwg OP11 to verify and or drill required holes in fuselage to accomodate wire harness. Drilled where neccessary and added required grommets where needed.

4. Drilled the two ground stud holes on each side of terminal block but will wait on acs order for the studs.

5. Added 3 addel clamps to front brace for the comming wire harness

6. Put down some tape along the terminal block and labeled each stud with a sharpie. This is ugly but temporary. Also did the same inside switch console to help wire.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.