KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  8-3-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Join left and right canopy skirts together

light sanded the last coat of filler primer and then clecoed the skirts to the frame.

Thought I would need a way to block the skirts down at the joint but turns out I didnt need to after all. I did scuff sand the area in prep for the glass

Covered the areas I didnt want epoxy with wax paper and folded a bit of paper to build up about 3/32 gap above rail to glass in the aft center.

Glassed in two ovelapping layers of BID and covered with peel ply and now the wait for it to cure.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.