KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  4-18-2014
Number of Hours:  2.00
Manual Reference:  OP26
Brief Description:  dry fit the thottle and mixture cables to the carb

Made ff-702 spacer at6 stock and located the hardware bags for the control cables

Discovered taht the jam nuts were not included in the kit. Dont ask why, IDK! It even says on the instruction sheet in the bag that they arent incuded. Stupid! So I went to hardware store and bought some.

Dry fitted all the stuff together.

Noy FWF but concerning the same cables at operator side, I looked all over my plans for any indication on how these cables attach to the levers. I finally found a diagram that came with the quadrant and it seems that those clevis type connectors ends are also not included!. So I get to find and buy and pay more towards the fed-x and UPS college funds.

Also not FWF but concerning throttle, I worked on getting the rear throttle lever connected correctly to the push tube link to the front control area. Hard to manipulate these things thru thos little lightning holes etc. Probably spent an hour here alone.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.