KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  9-21-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  P brake hold lever 3 and rt brake line redo

Marked The transition valve position zone on my valve lever bracket. Its 27.5 degrees on each side of center. I then drilled 3 holes slightly larger than the plunge pin along the arc top and bottom.
The top 3 holes will be the open postion and the bottom 3 will be closed positions.

I had interferance from the baggage shelf lip and the bottom mounting bolt for the parking brake so I simply nade a reief vut there and then trial fit.

made a new brake line for the rt side from parking brake to the bottom of rt landing gear tower
It came out ok but you can see the slight imperfections of a straight and crisp line.
It will be fine and hardly visible.
' style=

Lever position bracket drilled

Lever position bracket drilled

' style=

Relief cut for p brake mounting bolt in baggage shelf lip

Relief cut for p brake mounting bolt in baggage shelf lip

' style=

Rt side brake line re made

Rt side brake line re made

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.