KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  12-18-2011
Number of Hours:  0.50
Manual Reference:  
Brief Description:  canopy slide-3

Finished countersinking the rivit holes on the top surface of the slide rail cap and then did the same on the bottom of the spacer. 57 countersinks total.

The 9 screw holes were drilled to plan spec but a An 507-6R screw is 9/64" and will not fit. I double checked this and these holes need to be drilled up to 9/64 or #27.
' style=

cap and spacer counter sunk rivit holes

cap and spacer counter sunk rivit holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.