KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  3-14-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  re-assembly-1 after AW inspection

Not much to report and zero photos to show but I started putting 2RV back together today. Got the rear emp faiting on and the aft fuse inspection panels secured. Moved to the baggage area and put the bulkhead cover on and then the passanger seat back and cushions. Installed the aft control stick boot. Put my limitations anf weight and balance documents in a clear zipper pouch.
Installed the wing bottom inspection panels. Those have about a dozen screws each times 6!
Then I put some anti chafe on my break lines and installed the covers where the gear leg attach bolts are
Tomorrow I plan to fix a couple of potential problems in the scat tube run and then re-install the cowling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.