KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  3-11-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  re install the fwd floor and seat pan for inspecti

As was previously mentioned in earlier post, I had the airplane open for a good AW inspection. However, it seems the DAR wants the airplane in ready to fly presentation except for standard inspection panels, Wing root covers and aft fuse inspection panels and under wing inspection/acess panels. So I reinstalled the fwd floor and seat pan assembly and the seat back and cushion. Its 54 screws and so I managed to strip a couple more that required removal and redo but all is well. The time entered isnt necessarily time for build now but a time process to get from build aspect to inspection and first flight. I didnt bother with photos but will hopefully have one to post this Thursday if my DAR signs it off. Tomorrow I will provide some more clearence for the rear throttle connection tube that goes to front throttle. It seems that its rubbing slightly now that ALL the screws are in place and tight. Didnt expect that but....
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.