KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  3-17-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Counterweight repair, ASI repair-1

1. Early in build I made the mistake of cutting both counter weights when only the right side was to be cut. I had saved the piece and today I epoxy it back on. When dry I will secure with a counter sung screw

2. Fileing the edge of rt counter weight to countour with the skin

3. I trying to fix the ASI, I need to thread the remaing stub with a # 2 die. I need to somehow secure the stub so it doesnt turn while I thred it. I drilled a scrap of aluminum and epoxied on to the stub. When dry, I ll try to thread it.
' style=

Epoxy lead piece on to the left elevator counter weight

Epoxy lead piece on to the left elevator counter weight

' style=

File countour on rt counter weight to match

File countour on rt counter weight to match

' style=

epoxy aluminum strip to ASI control stub

epoxy aluminum strip to ASI control stub

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.