KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  9-22-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  emp fairing and gap seal final install fit

Sanded the emp fairing for primer and then sprayed primer on it. Let dry for couple hours and wet sanded.

Fit the underside gap seals so that they terminate in that small gap fwd of the HS and the part of the fairing that wraps around the fwd edge. Its a terrible fit but workd to hide the seal well so im going with it for now.

I countersunk the screw holes in the top lip to the VS and installed screws without the tinnerman washers for now. Trying to decide if I like the looks any better this way.

I also tightened a loose oil line and then filled the oil cooler with some oil and reaatached the line and torqued
' style=

Adding oil to the oil cooler

Adding oil to the oil cooler

' style=

Lower HS gap seals installed

Lower HS gap seals installed

' style=

Empenage fairing done

Empenage fairing done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.