KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  5-30-2014
Number of Hours:  1.25
Manual Reference:  
Brief Description:  rt side baffle tension rods finished and installed

I already had previously cut to length the tension rods so today I worked on getting the bends and or joggles in them so that they would fit without rubbing against anything. I also threaded them to 6-32 and cut off excess rod. Installed the steel lock nuts and tightened up. Ill get to the other two after I put the left front baffle back on

post 3/3 today.
' style=

Put necessary bends in the rt ibd ension rod and threaded

Put necessary bends in the rt ibd ension rod and threaded

' style=

Rt side obd tension rod joggle around an oil return line

Rt side obd tension rod joggle around an oil return line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.