KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  3-15-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  redo cylinder 2/oilcooler baffles-1

I had recieved my replacement parts from vans to re drill and cut to fit the #2 cylinder baffle and oilcooler mount baffle. I had to grind to fit the baffles and then rivit on the doubles after drilling them out from the old baffle. Dimple and re rivit them to the new. Then I begain the guessing game of how much to lower the oil cooler doubler sio it could be match drilled to the the mount and the cylinder baffle flange. I somewhat decided I needed to lower the cooler 1/2 inch from the last fitting and so I did that pus a little. Drilled the 4 corners and clecoed and screwd on to the engine for cutting new clearence with cowl once I can get the cowl on again
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.